
University Science Wing
Delaware, OH
Project Details
Square Footage | 40,000 sq ft |
Duration | 18 months |
Value Range | $12M – $16M |
Location | Delaware, OH |
The Challenge
The university needed a new science facility completed before the fall semester, with specialized lab spaces for biology, chemistry, and physics. The project required complex laboratory fume hood systems, chemical storage, and emergency shower/eyewash stations throughout.
The Solution
We implemented an accelerated construction schedule with overlapping site work and foundation phases. Laboratory designers collaborated with each department to finalize casework and equipment layouts. A dedicated commissioning agent verified all lab safety systems before occupancy.
The Result
The facility opened on time for the fall semester, featuring 12 research labs, 4 teaching labs, a 200-seat lecture hall, and a glass-walled atrium for student collaboration. Lab energy consumption is 35% below code baseline thanks to heat recovery systems.
Project Gallery
Start Your Next Project
Ready to bring your vision to life? Contact Full Armor Construction Services today for a free consultation.

