Project Details

Square Footage
50,000 sq ft
Duration
9 months
Value Range
$3.5M – $5.2M
Location
Grove City, OH

The Challenge

The client needed a distribution center with 40-foot clear heights, 20 dock doors, and 50,000 sq ft of temperature-controlled storage — all within a 9-month window to meet peak season demand. The site had poor soil conditions requiring deep foundation work.

The Solution

We used a design-build delivery model to compress the schedule, with foundation design finalized while the building shell was being engineered. Deep foundation piles were installed early, and tilt-up concrete panels allowed rapid enclosure. A pre-action sprinkler system protected the high-rack storage.

The Result

The distribution center was completed one week ahead of schedule, featuring ESFR sprinkler protection, LED lighting with motion sensors, and a 5,000 sq ft office mezzanine. The client reported a 25% improvement in picking efficiency compared to their previous facility.